This project is a GREAT example of Build-It Construction’s ability to again SHARE space with other contractors. During this aggressive summer, HKS had FOUR general contractors performing tasks from this project to erecting a new building adjacent us.
- Constricted above ceiling space at ground floor level required carefully coordination for MEP infrastructure above
- Logistics for materials staging and delivery was all just in time
- Building was occupied on floors above and adjacent spaces, as well as ‘other’ projects occurring in tandem, thus logistics was critical
- Provided infrastructure for and coordination of all owner vendors (AV, IT, Recording Etc)