Proudly serving MA, ME and NH

Case Studies

Occupied Eight story apartment building in downtown Cambridge, MA. Removal and replacement of flooring finishes and wall covering throughout all corridors required careful coordination with tenants and operations. All tenant doors/frames were also painted while apartment units were occupied.

  • Six different Flooring Specifications
  • Sizing and preparation of new wall covering at existing walls
  • Working around owner’s schedule to mitigate disruption to tenants
  • Socialize Rooms, Strategize Rooms, Leasing Office and Five Floors of Common Corridors
  • No punch list

Build-It Construction boasts a phenomenal track record working within occupied spaces, logistically challenging institutional settings with aggressive schedules. The project in reference is a renovation of multiple lecture rooms. We were able to successfully introduce a raised platform for added seating and ADA compliance to these spaces while also coordinating the following:

  • Precise infrastructure layout of: Floor Boxes, Projector Mounts, DTS (distance to screens)
  • Sound attenuating acoustical fabric wrapped panels
  • Constant communication with Owner and Owner vendors
  • Special detailing in coordinate various flooring patterns and seams
  • 100% commitment to having rooms ready BEFORE turn over date

How do you build out a space that has 75% of the scope above and within the ceiling, which is 24 feet above the finished floor? Easy. Safely construct a full staging platform at the entire footprint and build from the top down. That is how Build-It was able to quickly and safely coordinate all trades- working on top of a fully staged auditorium and then reducing the tiers as the project continued.

  • Aggressive 9 week project schedule during prime ‘Holiday Season’
  • DMX Control system for custom lighting fixtures and scenes to tie
  • Multiple tiered ceiling systems, and structural components for supplemental support and tiered seating.
  • Custom millwork install and matching of building that was constructed in early 1900’s

This project is a GREAT example of Build-It Construction’s ability to meet an extremely difficult time table while sharing a portion of the space with another construction management firm during the project. Our team managed the entire project, including owner’s vendors, while paying great attention to detail to provide a decorative finishes package. An extremely aggressive schedule of 16 weeks, many of those weeks ran double shifts, equated to turning over approx. 2,400/SF per week!

  • This project had an aggressive buyout and material procurement deadline.
  • All finishes and fixtures were not ‘off the shelf’ and required expediting shipments to meet a compressed deadline.
  • High End and custom finishes abound provided a unique feel for the finished project.
  • Space was turned over on time for grand opening and customer relocate

Experience.
Vision.
Quality.

Let’s build your dream home.

Let's Stay in Touch

Name(Required)
This field is for validation purposes and should be left unchanged.